This paper outlines Link division's approach to the general training requirements of the B-52 WST, and the specific requirements of the Instructional System. A review of the analysis and design approach is presented, as well as an overview of the resulting Instructional System, including several of the factors which influenced the design and development of the system. Several design goals were established for the Instructional System and, at this writing, the system has undergone several months of limited qualification testing by the Air Force test team, culminating in a production contract award to Link.
The Semi-Automatic Instructional System
2 Views